Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

am1100theflag.com
am1100theflag.com > news > lane-closures-begin-on-interstates-29-94-in-fargo-west-fargo

Lane closures begin on interstates 29 & 94 in Fargo & West Fargo

2+ mon, 5+ day ago   (196+ words) FARGO & WEST FARGO, N.D. – Construction has begun on interstates 29 and 94. Concrete is being repaired on eastbound I-94 leading to one lane being open between Veterans Boulevard and I-29. Work will move east to the Red River as construction progresses and shift…...

am1100theflag.com
am1100theflag.com > news > construction-begins-monday-on-i-94-in-fargo-moorhead-32nd-ave-s-downtown-fargo

Construction begins Monday on I-94 in Fargo-Moorhead, 32nd Ave S & Downtown Fargo

3+ mon, 3+ week ago   (210+ words) FARGO-MOORHEAD – Expect to see more orange in Fargo-Moorhead on Monday, May 18 for road construction. Expect slowdowns on Intestate 94. Crews will close lanes to install the bases and structure for a new message board on the North Dakota side of the…...

am1100theflag.com
am1100theflag.com > news > construction-begins-on-i-94-in-fergus-falls-closing-interchange-ramps

Construction begins on I-94 in Fergus Falls closing interchange ramps

4+ mon, 1+ week ago   (103+ words) FERGUS FALLS, Minn. – The on and off ramps for Interstate 94 are closed at exit 54 for Minnesota Highway 210 until October. There is a detour to County Road 1/Tower Road. Highway 210 is open during construction and traffic will shift to one side…...